Prevue Pet Products 2117 Heavy-Duty 20' Tie-Out Chain | Zinc Plated Oval Safety-Welded 3.8 mm Links, Dog Tie Out for Yard, Long Lead for Dogs Up to 150 Pounds

★★★★★ 4.2 109 reviews

US$8.00
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by www.corsiadrerifiuti.it
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$8.00
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Nov 7
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by www.corsiadrerifiuti.it
Free 30-day returns Details

Product details

Management number 247490882 Release Date 2026/08/16 List Price US$8.00 Model Number 247490882
Category

Prevue Pet Products 2117 Heavy-Duty 20' Tie-Out Chain,Silver

  • TIE OUT CHAIN FOR OUTSIDE USE - This heavy-duty metal tie-out provides a strong, dependable way to secure larger dogs breeds outdoors, allowing controlled freedom of movement while maintaining safety
  • DURABLE DESIGN - Designed for outdoor use, this tie-out is a durable alternative to a leash, offering reliable restraint for dogs without the stretch or wear found in fabric or cable options
  • STRONG, CHEW-PROOF CHAIN BUILD - Constructed from zinc plated steel, this chain helps resist chewing and weather exposure, delivering dependable performance for active outdoor dogs
  • VERSATILE SIZE RANGE - Suitable for medium to large dogs, the 20' length allows roaming without confinement, making it an ideal option for everyday outdoor use, travel, camping or yard setups
  • ABOUT PREVUE PET - Since 1869, Chicago-based Prevue Pet Products has built a well-deserved reputation for safe, high-quality, well-designed products for domesticated pets and their human companions
UPC 048081021170
ASIN B01J7H9VV0
Size 20 Ft
Color No Color
Pattern Dog
Pet Type Dog
Brand Name Prevue Pet Products
Unit Count 1 Count
Item Length 20 feet
Item Weight 3 pounds
Closure Type Snap,Snaps
Manufacturer PREVF
Model Number 2117
Material Type Zinc-plated steel
Dog Breed Size Large
Item Type Name Prevue Pet Products 2117 Heavy-Duty 20' Tie-Out Chain,Silver
Target Species Dog
Number of Items 1
Number of Packs 1
Included Components Prevue Pet Products 2117 Heavy-Duty 20' Tie-Out Chain,Silver
Warranty Description Warranty
Item Dimensions L x W 240"L x 0.15"W
Manufacturer Part Number 2117
Global Trade Identification Number 00048081021170

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.2 out of 5
★★★★★
109 ratings | 45 reviews
How item rating is calculated
View all reviews
5 stars
78% (85)
4 stars
6% (7)
3 stars
3% (3)
2 stars
2% (2)
1 star
11% (12)
Sort by

There are currently no written reviews for this product.